MEET SINO AT ELECTRONICA 202610–13 NOV · MUNICH, GERMANY
LET’S CONNECT IN MUNICH

MEET SINO AT2026.

The next connection.
The next possibility.

WHENNovember 10–13, 2026
WHEREMesse München, Germany
Hall B5 · Booth B5.558/6
EXHIBITING ASHorngshing LimitedSINO is a branch of Horngshing Limited.
BGA integrated circuit packages with solder balls
SINO / ELECTRONIC COMPONENTS
SMALL COMPONENTS.Larger possibilities.Industry photography
FIND YOUR COMPONENT

Start with what you need.

ONE CLEAR SOURCING REQUESTComponent selection/BOM consolidation/Supply planning
01 / COMPONENT PORTFOLIO

The building blocks
of your next idea.

Explore by function. Specify by part number.
Build your requirements into one RFQ.

Browse manufacturers
Integrated circuits and their fine leads on a circuit board
COMPONENTS / UP CLOSESmall details. Essential connections.ICs · Analog · Memory · Power · Interfaces

Category references only. Availability, pricing, sourcing and lead times are confirmed per quotation.

02 / MANUFACTURER DIRECTORY

Know the brand?
Start there.

Reference directory for sourcing requirements. Listing does not imply authorized distribution or a commercial partnership.

03 / SOURCING SOLUTIONS

Different challenges.
A clear next step.

From one urgent component
to a coordinated purchasing plan.

Semiconductor packages stored in carrier-tape reels
01

Spot & shortage sourcing

Working around a supply gap? Start with the exact part, required quantity and delivery window.

Part number · Quantity · Need-by dateBuild your request
Different semiconductor packages and carrier tapes
02

BOM consolidation

Bring your component requirements together. Review each line before preparing one quotation request.

Multiple parts · One clear requestBuild your request
Semiconductor packages transferred from trays into carrier tape
03

Scheduled procurement

Share your forecast and batch requirements so delivery schedules can be discussed against your plans.

Forecast · Batch size · Delivery scheduleBuild your request
Technician handling a component under the inspection microscope
QUALITY / IN THE DETAILSDefined before delivery.Specification / Documentation / Inspection
Horng Shing chip inspectionCompany profile
04 / QUALITY REQUIREMENTS

Make every requirement
part of the process.

Agree the acceptance criteria before an order is placed. Include the documentation and inspection requirements that matter to your project.

01Confirm the specification+

Capture the manufacturer part number, package, temperature grade and acceptable date code. State whether substitutions are permitted.

02Define source documentation+

Identify the source and traceability documents your order requires before confirming a quotation.

03Agree the inspection scope+

Specify packaging, labels and visual checks. Request any additional test scope and reports in the quotation.

04Check delivery requirements+

Confirm antistatic and moisture-sensitive handling, shipment labels, destination and delivery timing as applicable.

05 / APPLICATIONS

Built into everyday progress.

Find a starting point for your application.

Technician checking a chip on a microscope display, with component reels on the bench
CHIP INSPECTIONA closer look at every component.
Storage racks shown in the Horng Shing company profile
STORAGE RACKS
DIP integrated circuit packages and their leads
IC PACKAGES / DETAIL
Inspection & storage: Horng Shing profile · IC close-up: Pixabay / PexelsImage sources
06 / ABOUT SINO

Good connections.
Lasting partnerships.

Components. Connections. Possibilities.

HONG KONG SINO ELECTRONICS is a branch of Horngshing Limited, focused on IC and electronic component sourcing enquiries for domestic and international customers.

We believe lasting cooperation starts with a clear understanding of what a project needs. Our approach brings component specifications, quality expectations and purchasing plans into one conversation.

Discover our company
01Our brand02Mission & vision03Our philosophy04Our goals
07 / REQUEST FOR QUOTATION

Your parts.
One clear request.

Add parts individually or bring your whole BOM.
Review your list before you export.

Preview · Local RFQ export

01Your component list

Component lines stay in this tab when you switch language.

02Your contact & requirements

Close-up of a surface-mount integrated circuitBEFORE YOU SEND

A few useful answers.

A better request starts with clear information.

Can I request a part that is not listed?+

Yes. Enter the complete manufacturer part number in the search bar and add it to your RFQ. Catalog categories are a starting point; availability is confirmed separately.

How should I prepare my BOM?+

Include Part Number, Quantity and Manufacturer. Paste rows from a spreadsheet or import a CSV / TSV file. Add package, date code and delivery requirements in your notes.

Are listed brands authorized distribution partners?+

The directory helps identify component requirements and does not imply an authorized distribution agreement. Confirm sourcing, documentation and availability for each quotation.

Where can I meet SINO at electronica 2026?+

We are exhibiting as Horngshing Limited at Messe München, November 10–13, 2026. Meet our team in Hall B5 at Booth B5.558/6.

RFQ 0
BOM IMPORT

Bring your list.

Paste rows from a spreadsheet or choose a CSV / TSV file. Columns: Part Number, Quantity, Manufacturer. Up to 100 lines, 2 MB.

Download template

YOUR DATA

Your draft stays here.

BOM files are read in your browser. Component lines are stored in this tab’s session storage to support language switching. Contact fields are not saved in browser storage. RFQ downloads are generated locally; no sales submission or analytics service is connected.